Fit-to-purpose lay-up solutions save cost while maintaining equipment integrity

Client Challenge

The drilling ship was stationed at Labuan anchorage under a warm lay-up, with its drilling team onboard to maintain critical drilling equipment. However, the client faced mounting operational costs and required a solution that would:

  • Reduce crew and overhead costs
  • Ensure drilling equipment remained fully protected
  • Maintain operational readiness without compromising asset integrity

Altus’ Solution

Altus developed a customised economical lay-up and preservation package designed specifically for the client:

  • Crew size reduced by 95%, immediately cutting manpower-related costs.
  • Preservation activities implemented to safeguard drilling equipment against degradation.
  • Cost-optimisation measures integrated without jeopardising equipment reliability.

The Results

  • Significant cost savings achieved through reduced crew and streamlined operations.
  • Full integrity of drilling equipment maintained, ensuring readiness for reactivation.
  • Balanced approach that allowed the customer to cut expenses while protecting critical assets.

Altus Oil & Gas Malaysia is capable of designing fit-for-purpose lay-up and preservation strategies that not only reduce operational costs but also extend equipment life and protect investment value. By tailoring solutions to client-specific needs, Altus helps operators safeguard assets while stayin financially efficient.