back to: Case Study

FSO Lay-Up at Kuantan Port

Image 1
Image 2
Image 3

Client Challenge

A client required the FSO to be laid up near its operating location off the Terengganu coast. However, the nearest gazetted lay-up area was in Johor—far from the vessel’s current position.

  • Location constraints: Limited lay-up options close to the FSO’s location.
  • Higher costs: Relocating to Johor would mean longer sailing time, higher fuel consumption, and increased operational expenses.
  • Regulatory hurdle: Kuantan Port, the nearest option, was a non-gazetted lay-up anchorage requiring special approvals.

Altus’ Solution

Altus leveraged its expertise in marine solutions and regulatory coordination to secure a cost-effective solution:

  • Engaged Kuantan Port authorities to obtain approval
  • Prepared all required documentation and arrangements for a safe and compliant lay-up process.
  • Provided full project management to ensure seamless coordination with port authorities and stakeholders.

The Results

  • Reduced lay-up costs by minimising sailing distance and fuel consumption.
  • Shortened vessel downtime by avoiding lengthy relocation to Johor.
  • Delivered a safe, compliant, and efficient lay-up solution tailored to the client’s needs.

Altus Oil & Gas Malaysia has successfully delivered innovative, cost-saving marine solutions while navigating complex regulatory frameworks. By combining strong local partnerships with technical expertise, Altus helps clients achieve operational efficiency without compromising safety or compliance.